Super Nyadi Hydropower Project (40.27 MW)

The source river of the Super Nyadi Hydropower Project is Nyadi which flows between Bahundada and Bhulbhule VDCs of the lamjung District. The project is identified for 40.27 MW and application is submitted to DoED for the Survey License on 2071/05/18 and the Survey Licence is obtained on 2071/10/13. The Company has already signed with Clean Energy Consultants Pvt. Ltd. for the feasibility study of the project. Desk study report has finalized the project salient features and all the project components is purposed to be construct at right bank of the river.

Location : Bahundada and Bhulbhule VDCs, Lamjung District.
Type of Scheme :  Run-of-River
Coordinates : Northing :  28o 21' 07" N      -     28 o 24' 23"N
Easting : 84 o 26' 57"E        -     84 o 30' 18"E
Design Discharge : 6.99 m3/s
Water Source : Ngadi River
Gross Head : 690.00 m
Installed Capacity : 40.27 MW
Total Annual Energy : 250.87 GWh
Dry Energy : 49.55 GWh
Wet Energy : 201.32 GWh